In this project we've fitted reclaimed herringbone Sapele parquet. All the blocks were cleaned individually. Before the flooring was installed, the areas were levelled with levelling screed. Floor sealed with 3 coats of varnish. The project was carried out in London Bridge area in Southwark, SE1.
Press to enlarge
Related post
03AprComments Off on Pine floor boards restoration project in Plumstead, SE18 – London